Pier 160 Small Boat Access, Naval Base, Point Loma
Naval Base, Point Loma, CA
December 2014 to February 2016
$1,578,960
Marathon Construction provided design and construction of small boat access to Pier 160 at Naval Base Point Loma which included two gangways down to floating platforms and walkways. The work was needed to maintain existing boating capacity at the pier. Work included removal of two existing 18-inch (diameter) concrete guide piles, reusing 16 existing 18-inch concrete guide piles, and installing 29 new 18-inch concrete guide piles. The work also included extension of electrical service and relocation of a jib crane from Finger B to Finger C.