Repairs to Pier 2, Naval Base San Diego, San Diego, CA
This project addressed multiple maintenance tasks on Pier 2 at Naval Base San Diego. Work included: Repairs to 164 concrete piling; over 7,000 SF of underdeck concrete repair; over 9,000 SF of top deck repairs; removal and replacement of 40 vault lids. Work was performed while pier remained in operation.