Marine Construction

  • Revetment Placement
  • Setting Precast Panels for Cutoff Wall
  • Setting Soffit for Pier Deck

Nimitz Wharf and Pier Replacement

  • Revetment Placement
  • Setting Precast Panels for Cutoff Wall
  • Setting Soffit for Pier Deck

Point Loma, CA

UCSD Scripps

May 2014 – July 2016

$15,500,000

In March 2014, Marathon Construction was awarded a project to remove the existing UCSD Nimitz Pier and Wharf facility in Point Loma, CA. Demolition work included: removal of the existing pier and wharf (approx. 29,000 SF), removal of 162 concrete and timber pile, and about 11,000 CY of dredging/shoreline excavation, including upland disposal. Improvements included: construction of a new pier and wharf including installation of 129 structural concrete pile and 104 concrete fender pile; Installation of 6,000 ton of shoreline rock revetment; utility upgrades including electrical, storm water, water, air and sewer systems; Installation of 305 LF of precast cutoff wall; upland paving and striping.

Previous Next

Marathon Construction logo

Address
10108 Riverford Rd. Lakeside, CA 92040

Email Us
info@marathonsd.com

Contact
p. 619-276-4401 / f. 619-276-0717

CA License No. 411338 A, B

Copyright 2025 © Marathon Construction. All rights reserved. Privacy Policy Developed by TinyFrog