• Marine Construction
  • Industrial Commercial Construction
  • Environmental Mitigation / Reclamation / Habitat Restoration
  • Heavy Civil/ Earthwork
  • Dredging

Call Us
619-276-4401

  • Home
  • About
    • Clients
    • Team
  • Capabilities
  • Projects
  • News
  • Careers
  • Contact
  • Marine Construction
  • Industrial Commercial Construction
  • Environmental Mitigation / Reclamation / Habitat Restoration
  • Heavy Civil/ Earthwork
  • Dredging

Heavy Civil/ Earthwork

Blacks Beach Interim Road

Blacks Beach Interim Road

University of California San Diego

March 4 – 11, 2016

$99,335

Emergency short term repair of existing Blacks Beach access roadway from lower black’s beach lifeguard parking area to correct for the sand that had been washed out by the recent high tides and surf.  Built a slope revetment system including a course layer of base rock consisting of 1ft minus quarry run and capped off with 1/2 Ton minimum rip rap. The infill behind the revetment consisted of compacted fill to provide a driving surface to access the beach.

  • <
  • 1
  • 2
  • 3
  • >
BLDG 632 Emergency Erosion Repair
Older Entries
Newer Entries

Marathon Construction logo

Address
10108 Riverford Rd. Lakeside, CA 92040

Email Us
info@marathonsd.com

Contact
p. 619-276-4401 / f. 619-276-0717

CA License No. 411338 A, B

Copyright 2023 © Marathon Construction. All rights reserved. Privacy Policy Developed by TinyFrog