General Dynamics / NASSCO
San Diego, CA
January 2008 to June 2009
$22,100,000
Work included demolition of existing structures including concrete, asphalt, utilities and buildings. Work involved installation of new, heavily reinforced ship block assembly concrete slabs, overhead crane rail, footings and services, heavily reinforced concrete slabs for future blast and paint buildings, hazardous building materials abatement, storm drain, sewer, compressed air, and water utilities, high voltage electrical upgrades and substations, asphalt paving, and concrete paving.